Use a simplified levelling exercise. A benchmark elevation is 130 m; backsight 1.7 m establishes instrument height. Foresights to points P and Q are 2.1 and 2.45 m. A check foresight to a second benchmark is 1.4 m; its known elevation is 130.295 m. Elevation = instrument height − staff reading. Signed closure error = computed check elevation − known elevation. No construction-grade specification is implied.
Calculate the elevation of Q in metres. Keep intermediate values unrounded; round the final answer to 4 decimal places if needed.