A supplied hypothetical coating sheet specifies a 4:1 mixing ratio BY MASS for A:B. Prepare 1500 g mixed material per batch; do not add thinner. A session needs 6200 g and a partial final batch is permitted. A batch is mixed at minute 15; its stated working period is 45 minutes from mixing. This is arithmetic with supplied data, not a product recommendation.
Calculate the batches needed including the final partial batch. Keep intermediate values unrounded; round the final answer to 4 decimal places if needed.