Rebar Drawing Arithmetic: Supplied Bend Allowances and Mass

Rebar Drawing Arithmetic: Supplied Bend Allowances and Mass

Original quantitative learning practice in English. All 24 questions are included. Four supplied cases exercise six related calculation targets; they form one topic, not four separate tests. Every question includes the complete initial data. Use the stated model and retain intermediate precision. Choose one answer. Learning target: 20/24, not an official pass mark. This bank covers the calculation topic in its title; it is not a complete professional examination, design approval or operating instruction.
1 of 24
A supplied bar sketch consists of straight centreline segments 700, 1100, 500 mm plus 2 bends. The drawing explicitly assigns 100 mm centreline length to each bend, separate from the straight segments. There are 16 bars; supplied linear mass is 1.58 kg/m. Do not infer real bend dimensions or structural suitability. Calculate the mass of the complete bar batch in kg. Keep intermediate values unrounded; round the final result to four decimal places if necessary.